Technical Library

Geotechnics · September 2024

Tracking Strength Changes Along 130 m of Drill Core

MPT strength measured on a continuous section of HQ3 core from Agnico Eagle's Goldex mine and compared with point load, Brazilian and UCS tests.

Project
Goldex mine, Agnico Eagle
Location
Abitibi, Canada
Application
Geotechnical characterization
Samples
HQ3 half core
Compared against
Point load, Brazilian, UCS

PaperAdvancing Orebody Knowledge with High-Resolution Rock Strength Measurement Using the Minpraxis Tester · MassMin 2024, Kiruna

Read the paper

Context

A continuous section of core from an orogenic gold deposit was logged for rock type, veining and microdefects.

The Work

The core was then split between conventional strength tests and MPT testing on half core.

Results

MPT results agreed with point load and Brazilian tests over 20 m composites and followed UCS trends down the hole. MPT strength dropped with increasing veining and microdefect intensity, in line with the conventional tests.

More from the Library

View all