Technical Library

Energy Efficiency · September 2019

Energy Efficiency Opportunities at Red Chris

Energy benchmarking and modelling of the Red Chris SAG, ball mill and regrind circuits to find energy conservation opportunities.

Project
Red Chris mill
Location
Northern British Columbia, Canada
Application
Energy efficiency
Samples
SAG, ball mill and regrind circuit surveys
Compared against
Energy benchmarks, alternative flowsheets

PaperA Summary of Energy Efficiency Opportunities for the Red Chris Comminution Circuits · SAG Conference 2019, Vancouver

Read the paper

Context

The Red Chris mill in Northern British Columbia processes copper-gold ore. The study looked for energy conservation opportunities in the SAG and ball mill circuit and in the regrind circuit.

The Work

Mill surveys were used to calibrate mill models, such as those in JKSimMet, and simulate alternative operating scenarios. Every circuit, including the Vertimill regrind circuit, was energy benchmarked, with Eliason laboratory stirred mill tests for the regrind circuit.

The options evaluated included SAG mill charge monitoring to allow lower mill speed, sending pebble crusher product to the ball mill circuit, sensor-based sorting of pebble crusher feed and changes to media size.

Results

Flexibility in the material handling system allowed alternative flowsheets to be assessed for the SAG and ball mill circuits. In the regrind circuit, surveys and benchmarking showed that the Vertimill separating tank was ineffective as a size classifier.